Hopkinton LNG Replacement Project 1903 – Drilling

HOPKINTON LNG REPLACEMENT PROJECT 1903 – Hopkinton, MA – Drilling
PROJECT NAME:
Hopkinton LNG Replacement Project 1903
Hopkinton, MA
OWNER/SITE DEVELOPER:
Eversource
CONSTRUCTION MANAGER:
Primoris Energy Services Corporation
GENERAL CONTRACTOR:
McCourt Construction
60K Street
South Boston, MA 02127

SCOPE OF WORK:

Multiple drills working in close proximity within a 20,000 square foot area to drill perforations in mass rock to depths up to 18 feet.  Drill patterns were 1 foot on center utilizing 4″ drill bits to assist in the efficiency of pneumatic hammering and hydraulic rock splitting.

Location: Hopkinton, MA 

 Schedule: Completed